Location

Europe

Industry

Shopping centers

Author

Álvaro Díez

Klépierre consolidates a 50% cut in electricity use with applied AI

50%

reduction in electricity use across centers

Klépierre shopping centers case study

With the need to optimize energy across a complex, multi-site portfolio, Klépierre faced an operational challenge defined by the diversity of its shopping centers. Large spaces with multiple uses, hundreds of tenants on independent contracts, and an energy infrastructure spread across different systems and providers made a unified view of operations especially hard.

Klépierre brought in Smarkia to integrate all of its energy, environmental and operational data into a single, scalable environment — a key first step to apply artificial intelligence, automate processes and improve efficiency across its assets, cutting consumption, driving decarbonization and meeting growing regulatory pressure.

The challenge

Find a digital solution able to centralize the entire energy operation of its shopping centers, overcome the structural barriers of the multi-site model and the split incentive, and deliver real-time visibility to anticipate inefficiencies, assign responsibilities correctly and optimize operations continuously.

Ready to kickstart your project?

Ready to kickstart your project?

Download

Download the full case study

and join the energy revolution.

All the energy, environmental and operational data from a complex multi-site portfolio, unified in one place and optimized with AI.

ISO 27001

ISO 50001

IPMVP

We reply within one business day. Your details go straight to our team, never sold or shared.

More stories

Leading real estate group

A flagship building piloting monitoring and AI to manage its own energy — savings without giving up comfort.

Autonomous building case study

Leading real estate group

A flagship building piloting monitoring and AI to manage its own energy — savings without giving up comfort.

Autonomous building case study

Leading real estate group

A flagship building piloting monitoring and AI to manage its own energy — savings without giving up comfort.

Leading food manufacturer

Real-time monitoring across a 50,000 m² plant — electricity, gas, compressed air and production — for a complete, always-current view of energy use.

Food manufacturing plant case study

Leading food manufacturer

Real-time monitoring across a 50,000 m² plant — electricity, gas, compressed air and production — for a complete, always-current view of energy use.

Food manufacturing plant case study

Leading food manufacturer

Real-time monitoring across a 50,000 m² plant — electricity, gas, compressed air and production — for a complete, always-current view of energy use.

Keep in the loop

Monthly updates • No spam ever

Keep in the loop

Monthly updates • No spam ever

Keep in the loop

Monthly updates • No spam ever